Post Reply

Please type the characters that appear in the image. The characters must be typed in the same order, and they are case-sensitive.
Open Preview Preview

You can resize the textbox by dragging the right or bottom border.
Insert Hyperlink Insert FTP Link Insert Image Insert E-mail Insert Media Insert Table Insert Table Row Insert Table Column Insert Horizontal Rule Insert Teletype Insert Code Insert Quote Edited Superscript Subscript Insert List /me - my name Insert Marquee Insert Timestamp No Parse
Bold Italicized Underline Insert Strikethrough Highlight
                       
Insert Preformatted Text Left Align Centered Right Align
resize_wb
resize_hb







Max 7000 characters. Remaining characters:
Text size: pt
More Smilies
View All Smilies
Collapse additional features Collapse/Expand additional features Smiley Wink Cheesy Grin Angry Sad Shocked Cool Huh Roll Eyes Tongue Embarrassed Lips Sealed Undecided Kiss Cry
Topic Summary - Displaying 4 post(s).
Posted by: Redchamp - Ex Member
Posted on: 07/01/04 at 03:49:18
The WDFW purchased the land. I testified along with Jeff Skrilletz of the WDFW before the Tacoma city council on extending their lease of a tiny parcel which is incorporated in this launch. Upon hearing our speeches, they unanimously extended the lease for 30 more years. This has been in the works for quite some time now. The WDFW was asked to utilize outside contractors as much as possibe so this was put out for bids. A contractor was selected and my guess is that he picked up some more and possibly less complicated work so he let this one slide. If you've ever run any work for the state, there are definitely hassles involved.
Fact/Opinion,
RC
Posted by: ryoki - Ex Member
Posted on: 06/30/04 at 17:24:50
Question: Was the name of the contractor public knowledge? I am wondering if they were contacted, would they disclose why they stopped.
I just can't help but have a gut feeling that the powers that be do not want this launch built. Some group, or individuals, or maybe local government is dragging this out. Maybe the contractor quit because he saw the money would not be there in the end, or the design could not be agreed upon? Do you have more info on that, or who knows it?
Posted by: harley - Ex Member
Posted on: 06/25/04 at 14:26:32
Hey since I love to tangle with the BIG BASS that the lake has to offer, I'm in.  Mark let me know who to send it too, address or web site and all. Yea I have talked with them in the past on that lake and i guess it has beeen about 7 years .  Last I heard the state was going to make it a big bass lake with a once in a life time keeper fish over 8lbs I don't know if that has changed any or not.  All 4 it ohh, low oxygen levels in lake, slow growing fish, some bio. guy said once.  Stay in touch.
Harley Cheesy Cheesy Cheesy
Posted by: Redchamp - Ex Member
Posted on: 06/25/04 at 06:05:28
Hey guys, just thought I'd let ya know that the contractor the WDFW hired to do the Kapowsin Lk launch dropped the ball for whatever reason this spring and it was to late to do the paperwork required to hire another for this year so the whole thing's put off again till next year.
As some of you know, I've been involved with this for about 7 years now but would love some help on the letter writting/emailing front. Address everything to the director of the WDFW.
RC
 